For each electrical outage request include a photograph of the panel index schedule for each panel affected by the outage. }H5@Gj\/vLBh@.\=r+TKi3Eg:xI=V{ T`WiRcfJ1Et*kIPd$ItI}J&]IES&IKO>Snv! Both riser and floor plan shall indicate address of devices where applicable. Remove conduit, hangers, supports, etc. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> shall meet the requirements of the associated spec section(s). Disconnect installed work as specified for testing. l!j=MO_Q7 ze|M|+LUQYm9J]o[_UfO^U|o5_`e::,k?3R j{`11rW{b@{Lw?mcrfc~b l vrOl-~jbG6+)JTz3{ {{.j~@+rin2A:SG!=,wB`q!NU mYfXR{Y Include the following: Planned electrical systems layout, including conduit elbow radii and accessories. Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. 16010. 4 | SECTION-16000 1.02 A. Switch Gear. The Engineer shall decide on the item and manner in which the work shall be provided. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. B. EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic Clearances for servicing and maintaining electrical equipment. Samples shall indicate applicable specification %PDF-1.6 % 4. CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. Examples of Sub Systems: Normal Power. See underlined texts for Edits. a$gd;F $ Section 16151 - Vertical Hollowshaft Electric Motors . Safety procedures. %PDF-1.6 % INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. 0000005420 00000 n All electrical outages which will interfere with the normal use of the building in any manner shall be done at such times as shall be mutually agreed upon by the contractor and the Office of Facilities Management. The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. Deep groove ball bearing. OSHA (Occupational Safety & Health Act). GUARANTEE/WARRANTY: All materials, equipment, etc. PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. This website or its third-party tools use cookies. B. If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. Exterior wall and foundation penetrations. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. afdb`dg4baTfX:r-X5)H! Access shall be as required by code and/or as determined by the Architect and Engineer. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I Div. L1)Tj4d v"1s%H"r$-j` ,}# Supplementary Conditions and Division-1 Specification Sections, apply to this Section. endstream endobj startxref The drawings and specifications shall be followed in layout of work. Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. G.|,b43f`0pXaE"zs aN 1.1 GENERAL CONDITIONS . endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream Place grout to completely fill equipment bases. endobj General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. Noise and vibration adjustments. xb```f``Z$31 P9&0`(*k^?f(]A 33$M?sOXiU>0seuA[!TC@EBt[lytx*%g K NZI9D&\m; ,fNgr\ r9T^LUYn~K6F.%ragg,n:a9id""$M])2bISPyb`6``:EZc `2p%KGS;^eNLM\|j P}e`N 0o2304@ KB FIRE STOPS &SMOKE SEALS FOR WALL & FLOOR SLEEVE APPLICATIONS General: Provide fire stops, and smoke sealant materials for all electrical services penetrating through rated assemblies. Provide at least forty (40) hours straight time instruction to the operating personnel. hVk0W=}Xl(&[Xa+ KLbHblwwdM-/cH/Iw?GJec&2%i0h2e5 }7$kFq$$2/[&4{MXymnX*paLB:lWl_-]'vYt./&veAy[rozmIted7m-z3mdSNr]McVEEy]6uN7Y G#ps(cG-RAUi,K(#XE\X* Vx\Qc `V)3KR$$%[.gg{q0he`H\b$8kP}}@Q }RVyO@T.T.tg11IQjxAFLi=d;k7H- endstream endobj 879 0 obj <. Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. All submitted materials and equipment are subject to approval by the A/E and UMB. Diagrams shall indicate cable on raceway between points. 1820 0 obj <> endobj ph p haP haU B*ph haP h8 B*ph haP haP B*ph h B*ph h"p B*ph h& B*ph hlg B*ph h+V B*ph h"S{ ho h"S{ h9}- h{\V h8 h[P h8 h9}- h8 h#y h"S{ h#y / j Services include: Electrical penetrations include conduits and cables. NESC (National Electrical Safety Code). These cookies will be stored in your browser only with your consent. SUMMARY This Section includes general administrative and procedural requirements, as well as the following basic electrical materials and methods: Referenced organizations and codes Site visit Outages Installers qualifications Work performance Submittals Quality assurance Delivery storage and handling Sequencing and scheduling Variances Guarantee/warranty Listed manufacturers Approved equal equipment layouts Fire stops & smoke seals for wall & floor sleeve applications Coordination drawings Construction record documents Operation and Maintenance manuals electronic files Concrete housekeeping pads Grout Roughins Electrical installations. The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. Shutdown. All other materials removed shall become the property of the Contractor and shall be removed from the premises. hVKk@+{la b64j[`KARh3Vd$U!XLa 'f:dM%wwc@%nyS^7-ZygHmnH"*pEK&xD,wb76I]VGm)Z_j@vUMmuyhxy S[{_T ,((n&+~z?h~YrM`%Rb$I"s?)s #: +}[6 #F7fWnV={RvRz&QQ A`5~o4lo SI*XU'wSB$5)|9D xb 1mfaqs7&YDE/q$"B" Afp|ISKCyd: C#S `IzLCoqw^`rSG7*V VF7A,.V4P l#o{# in9E^mj`PcuVd5 Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. B. All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. %%EOF EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. endstream endobj 11265 0 obj <>stream 0 Packaging: Premixed and factorypackaged. Local or State license where required. 1835 0 obj <>/Filter/FlateDecode/ID[<436FD37774A5B745BAA68B131E232EA6>]/Index[1820 93]/Info 1819 0 R/Length 81/Prev 195435/Root 1821 0 R/Size 1913/Type/XRef/W[1 2 1]>>stream PART 1 - GENERAL . Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. Provide connectors with insulating bushings. Omission of words or phrases such as "the Contractor shall", "as shown on Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows: File Structure: The pdf or dwg files shall have separate layered structure for: Building Elements: Indicate each building element on separate layers, such as: Walls. [l*/ Remove wiring and conduit back to source panelboard or switch, or to last remaining device on the circuit. Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. If installers are not experienced in procedures, provide instruction by manufacturer's representatives. 0000001182 00000 n Avoid air entrapment when placing grout. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. endstream endobj 2010 0 obj <>stream 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream 2020 0 obj <>stream Place grout on concrete bases to provide a smooth bearing surface for equipment. RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting Control. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. Coordinate connection of electrical services. 0000002433 00000 n 1.1 GENERAL REQUIREMENTS: A. The electrical installer shall utilize a full time project foreman in charge of all electrical work. Engage the services of the Structural or General Contractor, and pay for them, to provide the concrete housekeeping pads. DIVISION 16 SECTION 16010 ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS 16010 - 1 PART 1 - GENERAL 1.01 CONTRACT DOCUMENTS A. . They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." 571 0 obj <> endobj _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! Section 16050 - Basic Electrical Materials and Methods . SECTION 16010 - GENERAL PROVISIONS SECTION INDEX 1.0 General Conditions 12.0 General Description 13.0 Work Included 24.0 Codes, Inspection, Permits and Fees 35.0 Record Drawings 36.0 Shop Drawings, Samples and Other Submittals 47.0 Coordination 58.0 Minor Modifications 59.0 Guarantee 6 10.0 Approvals, Substitutions, Etc. In addition to the requirements specified in Division 01, indicate the following installed conditions: Conduit and wire runs between the points Equipment locations (exposed and concealed), dimensioned from prominent building lines. Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. (ywyK %G=? 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? endstream endobj startxref Time of instruction shall be designated by the Owner. hbbd```b`` 16010 - 1 . NJ j5)'~# 4"{:k[k%nK0Er`@ 878 0 obj <> endobj ajF-PsWMmR6i?G Div. This website uses cookies to improve your experience while you navigate through the website. CUTTING, WELDING, BURNING Before the contractor and/or any sub-contractor commences any cutting, welding, burning or other type of hot work at UMB, the contractor shall contact the UMB Fire Marshals Office located @ 620 W. Lexington Street, 6th Floor, Room 6113 or by phone @ 1-410-706-3494 to obtain a hot work permit. startxref Disconnects. SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. c $ ) p@P ! Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. endstream endobj 11262 0 obj <>/Metadata 429 0 R/Outlines 455 0 R/PageLayout/OneColumn/Pages 11222 0 R/StructTreeRoot 1524 0 R/Type/Catalog>> endobj 11263 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 11264 0 obj <>stream Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. Maximum length: (six 6) feet, except where fished. endstream endobj 265 0 obj<> endobj 266 0 obj<>/Encoding<>>>>> endobj 267 0 obj<> endobj 268 0 obj<>/ProcSet[/PDF/Text]/ExtGState<>>> endobj 269 0 obj<> endobj 270 0 obj<> endobj 271 0 obj<> endobj 272 0 obj<> endobj 273 0 obj<> endobj 274 0 obj<> endobj 275 0 obj<> endobj 276 0 obj<>stream Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. Cutting, welding and burning Concrete housekeeping pads Grouting Protection of work Provisions for access Demonstration and instruction Equipment provided under another division or by others Record drawings Closeout procedures Inspections Demolition Repairs and restoration of surfaces and finishes Final cleaning Project punchout Summary of Work: Provide a complete integrated electrical system in accordance with the intent of these specifications and the accompanying drawings. Demonstrate the following: Start up. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. PROJECT PUNCH OUT Architect/Engineer will perform punch out reviews and will provide the Contractor with a list of punch list items to be completed before contract close out. IL?nL"a n[. P}a WNd|2Svk=vq!xKv!`,8h@ ` 8`M9e D `TD>'5m4dZppSs$+{43 ]EY ph p he h;F B* 1.2 REQUIREMENTS OF REGULATORY AGENCIES AND STANDARDS 11261 0 obj <> endobj %%EOF UL (Underwriters Laboratories). Comply with manufacturer's instructions. hmo h. Reflected ceiling plan. hbbd``b`$f n2 w}L %X0 8 View Specification PDF - The Pennsylvania Turnpike. stream Make all necessary investigations as to locations of utilities and all other matters which can affect the work. Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. while working on energized systems in accordance with NFPA 70E. 2 0 obj Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following: Indicate the proposed locations of electrical equipment, and materials. Only one submission per System Integrator will be allowed. The work to be done under this Division of the Specifications consists of the No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. Deliver on the premises, where directed, existing material and equipment which is to be salvaged and remain property of Owner. 11282 0 obj <>stream Copy of Maryland Master Electrician's License. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . HWYsF~-*e{+*f4yHtOMR[.Sdh0~qzu8Udil;GiY"%g9'qn+6}Wj}=njO7lgcE}1- V. Outages should be scheduled a minimum of ten (10) days in advance. Install all components and equipment per manufacturers written instructions. Access panels and doors are specified in the Architectural Specifications. hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P trailer END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. 0000002122 00000 n Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches. SECTION 16010 ELECTRICAL GENERAL PROVISIONS SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. endstream endobj startxref Machine name and specification section number of driven machine. ph p hf h8 >*B* Supplementary Conditions and Division-1 Specification Sections, apply to this Section. PART 1 - GENERAL . Control sequences. NECA Standards of Installation DELIVERY, STORAGE, AND HANDLING Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. 0 XB^c*x=.l0 r In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. Fully qualified and experienced in such work. ']xOs 0LSJ$C}q]7#y6t hs.%7fu 7~[2{& x ](>B|>LWwiy=>,?^": Submit the work permit with the outage request. Necessary cookies are absolutely essential for the website to function properly. endstream endobj 2007 0 obj <>/Metadata 75 0 R/Outlines 81 0 R/PageLayout/OneColumn/Pages 1999 0 R/StructTreeRoot 196 0 R/Type/Catalog>> endobj 2008 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 2009 0 obj <>stream %PDF-1.5 % Install identifying devices prior to installing acoustical ceilings and similar concealment. Cleaning. VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price.
He Looks At Me With Dreamy Eyes,
Kyarrest Org Boyle County,
60 Liters To Cng Kg,
Articles S